Boiler Fee Schedule

AttachmentSize
2013-2014_bp_fee_schedule_w_fee_tables.pdf152.88 KB
Embedded Scribd iPaper - Requires Javascript and Flash Player
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
Contractor Licensing New Boiler Contractor Licence New Boiler Contractor Licence with Quality Control Program Boiler Contractor Licence (if renewed within one year after expiry). If renewed later than 1year after expiry, then new boiler contractor Licence fee is charged. Audit or Re-audit / Interview to obtain or maintain contractors Licence. Interview is part of the contractor Licensing process.
will be assessed based on the examination written date and not the application date.
2010 FEE
2009 FEE
UNITS
GST
$ $ $
346 779 144
$ $ $
346 779 144
per unit per unit per unit per hour
No No No No
Hourly Rate
Hourly Rate
Qualified Worker Certification and Examination (Fees for examination ) Exams / Papers Papers: Power Engineers, Boiler Operators, Refrigeration Operators. $ Evaluation fee applies before final Power Engineer exam. Ice Facility Operator. Safety Awareness, Oil Well, Greenhouse. API / National Board Exam Evaluation Fee. Power Engineers, Boiler Operators, Refrigeration Operators, IFO and Safety Awareness. Evaluation fee applies before final Power Engineer exam. Exam Rescheduling Fee. Charged when an exam is rebooked more than once. Re-examination Fee Re-Examination Fee - Ice Facility Operator Exam Re-marking Fee Welder Fees Welder Certification Certification Interim "A" Certificate of Qualification, initial and renewal. In force for 12 months or less. $ 234 176 $ $ 234 176 per site per site Yes Yes $ 95 $ 95 per procedure Yes $ $ $ $ $ $ $ $ 117 175 117 293 59 44 117 175 59 $ $ $ $ $ $ $ $ $ 117 175 117 293 59 44 117 175 59 per paper per paper per paper per exam one time fee per time per paper per paper per exam Yes Yes Yes Yes Yes Yes Yes Yes Yes
Interim "B" Certificate of Qualification, initial and renewal. In force for $ 60 days or less (initial) or 30 days or less (renewal). Granting of Certificate of Qualification (a) Power Engineers (i) 1st Class (ii) 2nd Class (iii) 3rd Class (iv) 4th Class (b) Boiler, Refrigeration and Oil Well Operator $ $ $ $ $
351 293 205 146 87
$ $ $ $ $
351 293 205 146 87
per unit per unit per unit per unit per unit
Yes Yes Yes Yes Yes
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
Installations Permits
2010 FEE
2009 FEE
UNITS
GST
Boiler / Pressure Vessel / Refrigeration Installation or Alteration $ Permit. Permit fee does not include inspection. Inspection Fees Re-inspection Fees. Assessed when an inspection of a previous non-compliance is performed. (minimum 1 hour) Operating Permits High Pressure Boilers, Low Pressure Boilers, Thermal Fluid Boilers (a) with a heating surface to 25 m2 inclusive (b) with a heating surface more than 25 m2 to 50 m2 inclusive (c) with a heating surface more than 50 m2 to 100 m2 inclusive (d) with a heating surface more than 100 m2 to 500 m2 inclusive (e) with a heating surface more than 500 to 1,000 m2 inclusive (f) with a heating surface more than 1,000 to 2,000 m2 inclusive Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 Hot Water Boilers (a) with a heating surface to 25 m2 inclusive (b) with a heating surface more than 25 m2 to 50 m2 inclusive (c) with a heating surface more than 50 m2 to 100 m2 inclusive (d) with a heating surface more than 100 m2 to 500 m2 inclusive (e) with a heating surface more than 500 m2 to 1,000 m2 inclusive (f) with a heating surface more than 1,000 m2 to 2,000 m2 inclusive Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 Digesters Shell volumetric measurement not more than 280 m3 Shell volumetric measurement more than 280 m3 Pressure Vessels Regular Service Designated Service Special Service LPG Service $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
114
$
114
per unit per hour per hour
No Yes Yes
Hourly Rate Hourly Rate
Hourly Rate Hourly Rate
214 321 392 569 1,104 1,281
$ $ $ $ $ $
214 321 392 569 1,104 1,281 427
per permit per permit per permit per permit per permit per permit per 1,000 m2
No No No No No No No
427 $
107 128 142 214 392 498 178
$ $ $ $ $ $ $
107 128 142 214 392 498 178
per permit per permit per permit per permit per permit per permit per 1,000 m2
No No No No No No No
427 683
$ $
427 683
per permit per permit
No No
Table B Table C Table D Table E
Table B Table C Table D Table E
per permit per permit per permit per permit
No No No No
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
Refrigeration Plants More than 125 kW prime mover nameplate capacity rating using Group 1 refrigerants More than 25 kW prime mover nameplate capacity rating using Group 2 or 3 refrigerants Plant Registration Fees - Risk Assessed & General Supervision Plants Registration of Plant (One time registration includes up to 5 hours documentation review, additional review charged at hourly rate) Initial Safety Audit Inspection by a safety officer Biennial Safety Audit (inspected every 2 years)
2010 FEE
2009 FEE
UNITS
GST
$ $
313 $ 313 $
313 313
per permit per permit
No No
$
797 Hourly Rate Hourly Rate
$
797 per registration per hour per hour per certificate per hour
No Yes Yes Yes Yes
Hourly Rate Hourly Rate 57
Biennial Renewal Certificate of Plant Registration (inspected every 2 $ years) Boiler / PV Additional Inspection on Request Re-inspection Fees. Assessed when an inspection of a previous non-compliance is performed. (minimum 1 hour) Boilers Hot Water Boilers Digesters Pressure Vessels Refrigeration Operating Permits - Federally Regulated Industries High Pressure Boilers, Low Pressure Boilers, Thermal Fluid Boilers (a) with a heating surface to 25 m2 (b) with a heating surface more than 25 m2 to 50 m2 inclusive (c) with a heating surface more than 50 m2 to 100 m2 inclusive (d) with a heating surface more than 100 m2 to 500 m2 inclusive (e) with a heating surface more than 500 to 1,000 m2 inclusive (f) with a heating surface more than 1,000 to 2,000 m2 inclusive Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 $ $ $ $ $ $ $
57 $ Hourly Rate
Hourly Rate
Hourly Rate Hourly Rate Hourly Rate Hourly Rate Hourly Rate
Hourly Rate Hourly Rate Hourly Rate Hourly Rate Hourly Rate
per hour per hour per hour per hour per hour
Yes Yes Yes Yes Yes
214 321 392 569 1,104 1,281 427
$ $ $ $ $ $ $
214 321 392 569 1,104 1,281 427
per permit per permit per permit per permit per permit per permit per 1,000 m2
No No No No No No No
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
Hot Water Boilers (a) with a heating surface to 25 m2 inclusive (b) with a heating surface more than 25 m2 to 50 m2 inclusive (c) with a heating surface more than 50 m2 to 100 m2 inclusive (d) with a heating surface more than 100 m2 to 500 m2 inclusive (e) with a heating surface more than 500 m2 to 1,000 m2 inclusive (f) with a heating surface more than 1,000 m2 to 2,000 m2 inclusive Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 Digesters Shell volumetric measurement not more than 280 m3 Shell volumetric measurement more than 280 m3 Pressure Vessels Regular Service Designated Service Special Service LPG Service Refrigeration Plants More than 125 kW prime mover nameplate capacity rating using
2010 FEE
2009 FEE
UNITS
GST
$ $ $ $ $ $ $
107 178 214 285 463 569 356
$ $ $ $ $ $ $
107 178 214 285 463 569 356
per permit per permit per permit per permit per permit per permit per 1,000 m2
No No No No No No No
$ $
427 683
$ $
427 683
per permit per permit
No No
Table A Table A Table A Table A
Table A Table A Table A Table A
per permit per permit per permit per permit
No No No No
$ Group 1 refrigerants More than 25 kW prime mover nameplate capacity rating using Group 2 or 3 refrigerants Federally Regulated Industries - Re-inspection Fees. Assessed when an inspection of a previous non-compliance is performed. (minimum 1 hour) Boilers Hot Water Boilers Digesters Pressure Vessels Refrigeration $
313
$
313
per permit
No
313
$
313
per permit
No
Hourly Rate Hourly Rate Hourly Rate Hourly Rate Hourly Rate
Hourly Rate Hourly Rate Hourly Rate Hourly Rate Hourly Rate
per unit per unit per unit per unit per unit
Yes Yes Yes Yes Yes
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
2010 FEE
2009 FEE
UNITS
GST
Manufacturing Shop Inspection, Audits, Design Revisions and Registered Design Manufacturing Shops and Audit Hourly Rate ASME Welding Procedure Registration Registered Design Hourly Rate (minimum 1 hour charge) Equivalent Standards Agreement Program Application Fees (Proposed fee change from 2007 ESA pilot application fees) ESA New Program Application fee ESA Program Renewal Application fee Miscellaneous Refund Processing Charge. For all transactions, except examination evaluation. In addition to this fee, any work that has been undertaken $ up to the date of the request for refund will be charged for at the current hourly rate. Custom Reports & Searches (per Technology) Replacement / Duplicate Standard Certificate of Qualification or Wallet Card (each) Application for each copy of a certificate of inspection Expedited Service for Design Approval. 2x standard fee for turnaround in 5 working days. 3x fee standard fee for turnaround in all other expedited requests. Application for variance from the Code $ $ 1,260 774 $ $ 1,260 774 per unit per unit Yes Yes Hourly Rate $ 172 Hourly Rate $ 172 per hour per unit per hour Yes Yes Yes
Hourly Rate
Hourly Rate
54
$
54
per unit
Yes
Hourly Rate $ $ $ Hourly Rate 54 54 -
Hourly Rate $ $ $ 54 54 -
per hour per unit per unit per unit per hour
Yes Yes Yes Yes Yes
Hourly Rate
BC SAFETY AUTHORITY FEE SCHEDULE: BOILERS Effective: January 1, 2010
DESCRIPTION
Notes to Fee Schedule Hourly Rates Normal working hours, inclusive except holidays, per hour Administrative Rate Overtime working hours Saturdays & Sundays inclusive except holidays and Monday to Friday inclusive, 4:30 p.m. to 8:00 a.m., per hour Holiday working hours, per hour Professional Rate Overtime working hours Saturdays & Sundays inclusive except holidays and Monday to Friday inclusive, 4:30 p.m. to 8:00 a.m., per hour Holiday working hours, per hour Plus expenses incurred, where applicable Interest Charges on Overdue Accounts Interest is charged at 3% above prime lending rate per annum (updated monthly) NSF Cheques A charge will be levied when cheques are returned "NSF" *Note: On professional rates, GST is assessed where applicable.
2010 FEE
2009 FEE
UNITS
GST
$ $ $ $ $ $
54 $ 81 108 $ $
54 81 108 144 216 288
per hour per hour per hour per hour per hour per hour
Yes Yes Yes ** ** **
144 $ 216 288 $ $
$
33 $
33
per unit
Yes v0410